- Home
- About
- Advantages of JPods
- Capacity
- Conservation
- Economics
- History
- Lifeboat Paradox
- Links
- Management Team
- Metrics
- Payback
- Peak Oil
- Project Flow
- Recipe
- Solar
- Technologies
- What are JPods
- Why JPods
- Be Involved
- News
- Cities
- Contacts
Objective: JPods privately funds construction and puts into operation solar-powered mobility networks between BWI Terminal, Car Rental, and Amtrak/MARC by:
Action Required:
Likely Route Alignment:
Starting at Amtrak/MARC Station:
Wider view from Amtrak/MARC Station on the lower left and terminal on the upper left. Car rental is off image to the lower right.
Looking from the hotels area toward BWI termial. Car rental and train station is off image to the right.
Coming into the BWI terminal. A station would be integrated into the garage.
First parking garage coming into BWI.
Wrapping around the near parking garage. Station would likely be integrated into the parking garage.
Phase 1:
From Car Rental, less than 10 minutes to car rental or trains.
From Terminal, less than 10 minutes to car rental or trains.
From Trains, less than 10 minutes to car rental or terminal.
Phase 2:
Capacity
The following image illustrates the number of equivalent lanes of traffic a single JPods rail can carry. There are 13 JPods vehilces in the same space required for 2 cars complying with the 3 Second Safety Rule. This equates to over 6 lanes of highway capacity on a single JPods rail.
Payback is based on cutting costs by 90%.
Fly over to various points on the BWI Network.
Fly along with a vehicle traveling to various points on the BWI Network.
Summary 3-minute video of JPods.
Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer